Road North Fork Rd
| Location Approximately between House Mountain Rd and Multiclum Rd (MP 4.9 to MP 5.2).
| Closure Date May 4, 2026 at 7:00 am
| Opening Date October 20, 2026 at 5:00 pm.
| Description K&E Excavating, on behalf of Marion County Capital Projects, will be closing the portion of North Fork Rd that lies approximately between House Mountain Rd and Multiclum Rd (MP 4.9 to MP 5.2). House Mountain Rd and Multiclum Rd will remain open through the closure.
The closure will begin Monday, May 4th, 2026 at 7:00 am and end on Tuesday, October 20th, 2026 at 5:00 pm. Emergency services will be allowed through the closure until the road is excavated and rendered unsafe or impassible.
****UPDATE: K&E have repaired the slope failure and the lane for emergency vehicle traffic has been reopened.****
|
French Prairie Rd NE.
| 1000 ft. South of Mahony Rd NE/ HWY 219 NE Intersection
| August 18th, 2026 at 7:00 am.
| November 30th, 2026. at 5:00 pm.
| Bridge Replacement, on behalf of Marion County Captial Projects. Will be closing the portion of French Prairie Rd NE located South approx. 1,000 ft. of the Mahony Rd NE/ HWY 219 NE Intersection. The closure is scheduled to begin on Tuesday, August 18th, 2026 as early as 7:00 am and will end on Monday, Novemeber 30th, 2026 at 5:00 pm. Local and Emergency vehicles will be required to used approved detour.
|
Drake Rd NE
| Work Zone will span between the bridge crossing at Butte Creek and S Drake Rd and Farm Rd Intersection.
| August 24th, 2026 @ 7:00 am
| September 11th, 2026 @ 5:00 pm
| Clackamas County will have a contracted paving company performing paving work on the following roadway, local and emergency traffic will be permitted through the closure. Detour will be provided to through traffic.
|
Buena Vista Rd S.
| Work Zone will span between Buena Vista Rd S, Talbot Rd S and the Willamette River.
| August 9th, 2026 @ 8:00 am
| TBD
| Marion County Bridge Crew will be dry docking the Buena Vista Ferry, the closure is scheduled to begin Wednesday, September 9th, 2026 at 8:00 and the re-opening date is to be determined.
|