Partitioning Information and Forms
Site Evaluations Related to Property Partitioning
Review of the existing septic system and onsite sewage system feasibility study on the proposed lot(s) is required when dividing property with an existing home
Site Evaluation Information
How to apply for a Septic Site Evaluation permit, includes information on items needed to submit with the application and the process
Site Evaluation to System Installation
Explains the steps involved in obtaining a permit to install an onsite wastewater treatment and disposal system
Existing Septic System Evaluation Report Instructions
Required on the parent parcel to establish the system location, size and condition. System is inspected to determine condition and whether the required setbacks from the proposed partitioning lines can be met.
Application for Onsite Wastewater Treatment System New Fees 8/1/2024
The application for site evaluation and/or septic system permits; includes fee information
Authorization to Apply
Site Plan Requirements - Required as part of the site evaluation and/or septic system permits; must include two for permits related to property partitioning
Site Plan Example - An example of a completed site plan
Existing Systems Evaluation Report (Replaces Pumper Form)
Required if the existing system is more than five years old
Land Use Compatibility Statement (LUCS)
Required for properties in urban growth boundaries, the UT (Urban Transition) Zone, and inside city limit
Test Pits
Requirements and diagram
Setbacks Table
Shows required distances from septic systems and replacement areas