Chapter 1 | Executive Summary | 1-1 |
---|
| | |
---|
Chapter 2 | Plan Overview | 2-1 |
---|
| | |
---|
Chapter 3 | Background and Existing Plans | 3-1 |
---|
3.1 | Review of Existing Plans and Studies | 3-1 |
---|
3.2 | Transportation Issues | 3-26 |
---|
| | |
---|
Chapter 4 | Goals and Objectives | 4-1 |
---|
4.1 | Mission Statement | 4-1 |
---|
4.2 | Goals and Objectives | 4-1 |
---|
| | |
---|
Chapter 5 | Facility Inventory and Existing Conditions | 5-1 |
---|
5.1 | Roadway Inventory | 5-1 |
---|
5.2 | Bicycle and Pedestrian Facilities | 5-14 |
---|
5.3 | Traffic Operations | 5-15 |
---|
5.4 | Public Transportation Providers | 5-35 |
---|
5.5 | Rail Service and Grade Crossings | 5-41 |
---|
5.6 | Air Service | 5-45 |
---|
5.7 | Water Transportation | 5-46 |
---|
5.8 | Pipeline Service | 5-49 |
---|
5.9 | Utility / Communications Service | 5-49 |
---|
| | |
---|
Chapter 6 | Projection of Future Traffic Volumes | 6-1 |
---|
6.1 | Population Forecast | 6-1 |
---|
6.2 | Future Traffic Projections | 6-3 |
---|
| | |
---|
Chapter 7 | Development and Evaluation of 20-Year Strategies | |
---|
7.1 | Description of Potential Strategies | 7-1 |
---|
7.2 | Strategy Evaluation | 7-3 |
---|
7.3 | Basic Roadway Needs | 7-6 |
---|
7.4 | Preferred Alternative | 7-6 |
---|
| | |
---|
Chapter 8 | Roadway System Needs and Recommended Improvements | |
---|
8.1 | Criteria for Identification of Existing Needs | 8-1 |
---|
8.2 | Existing County Roadway Needs | 8-3 |
---|
8.3 | Bicycle and Pedestrian Improvements | 8-18 |
---|
8.4 | Special Studies and Localized Plans | 8-20 |
---|
8.5 | Future County Roadway Needs | 8-22 |
---|
8.6 | State Highway and Regional Transportation Needs | 8-25 |
---|
8.7 | Transportation Demand Management / Options | 8-36 |
---|
8.8 | Scenic Routes and Tour Routes | 8-39 |
---|
| | |
---|
Chapter 9 | Recommended Non-Roadway Improvements | |
---|
9.1 | Off-Roadway Bicycle and Pedestrian Improvements | 9-1 |
---|
9.2 | Public Transportation | 9-5 |
---|
9.3 | Air Plan | 9-13 |
---|
9.4 | Rail Plan | 9-15 |
---|
9.5 | Water Plan | 9-17 |
---|
9.6 | Pipeline Plan | 9-19 |
---|
| | |
---|
Chapter 10 | Policies | |
---|
10.1 | Transportation System Management Policies | 10-1 |
---|
10.2 | Roadway Maintenance and Preservation | 10-7 |
---|
10.3 | Transportation Policies | 10-16 |
---|
10.4 | Future Evaluation of Transportation Issues | 10-27 |
---|
| | |
---|
Chapter 11 | Financing Plan | |
---|
11.1 | Funding for Transportation Improvements | 11-1 |
---|
11.2 | Forecasting Future Revenue | 11-2 |
---|
11.3 | Allocation of Revenue | 11-3 |
---|
11.4 | Financially Constrained 20-Year Plan | 11-5 |
---|
11.5 | Unfunded 20-Year Improvements | 11-13 |
---|
11.6 | Remaining Unfunded Needs | 11-17 |
---|
11.7 | Non – Road Projects | 11-17 |
---|
11.8 | Potential Funding Options | 11-18 |
---|
| | |
---|
Chapter 12 | Sub-Area Plans | |
---|
12.1 | Brooks Interchange Area | 12-1 |
---|
12.2 | Aurora/Donald (Fargo) Interchange Area | 12-9 |
---|
12.3 | Cordon Road (State Street to Auburn Road) | 12-15 |
---|
| | |
---|
Chapter 13 | Long Term Transportation Issues | |
---|
13.1 | Peripheral Routes and Strategic Corridors | 13-2 |
---|
13.2 | Passenger Rail Service with Supporting Access Network | 13-3 |
---|
13.3 | Transportation System Management (TSM) Strategies | 13-4 |
---|
13.4 | Aggressive Transportation Demand Management Strategies | 13-4 |
---|
13.5 | Additional Connections to Interstate 5 and Oregon 22 | 13-5 |
---|
13.6 | Additional Crossings of the Willamette River | 13-5 |
---|
13.7 | Changing Land Use and Transportation Issues | 13-6 |
---|
| | |
---|
Chapter 14 | Transportation Planning Rule Compliance | |
---|
14.1 | Findings of Transportation Planning Rule Compliance | |
---|
| | |
---|
Appendices | | |
---|
Appendix A: | Summary of Transportation Issues | |
---|
Appendix B: | Roadway Inventory | |
---|
Appendix C: | Bridge Inventory | |
---|
Appendix D: | Sidewalk Inventory | |
---|
Appendix E: | Power and Telephone Company Areas | |
---|
Appendix F: | Arndt Road / Oregon 551 Access Management Plan | |
---|
Appendix G: | Alternatives Analysis | |
---|
| | |
---|
List of Figures | |
---|
Number |
Figure Title |
Page |
---|
Figure 5-1 | Rural Road Functional Classification | 5-5 |
---|
Figure 5-1a | State Highway Classification | 5-7 |
---|
Figure 5-2 |
Pavement Condition Rating |
5-11 |
---|
Figure 5-3 | Rural Bicycle and Pedestrian Facilities | 5-17 |
---|
Figure 5-4 | Intersection Traffic Control Devices | 5-19 |
---|
Figure 5-5 | Average Daily Traffic Volume | 5-21 |
---|
Figure 5-6 | Intersection Level of Service | 5-25 |
---|
Figure 5-7 | High Crash Frequency Locations | 5-29 |
---|
Figure 5-8 | Interstate 5 / Hwy 22 Detour Routes | 5-33 |
---|
Figure 5-9 | Rural Transit Routes | 5-39 |
---|
Figure 5-10 | Rail Lines and Crossings | 5-43 |
---|
Figure 6-1 | Average Daily Traffic Volume | 6-13 |
---|
Figure 6-2 | Year 2025 Projected Daily Traffic Volume Demand | 6-15 |
---|
Figure 6-3 | 2004 to 2025 Projected Percentage Growth of Traffic Demand on High-Volume Routes | 6-17 |
---|
Figure 7-1 | Strategic Intra / Inter – County Corridors | 7-11 |
---|
Figure 9-1 | Potential Future Trails | 9-3 |
---|
Figure 9-2 | Existing and Potential Future Transit Route Corridors | 9-9 |
---|
Figure 10-1 | Roadway Maintenance Priority Matrix | 10-7 |
---|
Figure 11-1 | Total Receipts for 2004 | 11-2 |
---|
Figure 11-2 | Anticipated Average Annual Expenditures | 11-4 |
---|
Figure 11-3 | Location and Funding Status of Projects | 11-9 |
---|
Figure 11-4 | Location and Type of Recommended Projects | 11-11 |
---|
Figure 11-5 | Planned Expenditures by Project Type | 11-13 |
---|
Figure 11-6 | Transportation Funding Needs | 11-17 |
---|
Figure 12-1 | Brooks Interchange Area Vicinity Map | 12-2 |
---|
Figure 12-2 | Brooks Interchange Area Daily Traffic Volumes | 12-3 |
---|
Figure 12-3 | Aurora/Donald Interchange Vicinity Map | 12-9 |
---|
Figure 12-4 | Aurora/Donald Interchange Area Daily Traffic Volumes | 12-10 |
---|
Figure 12-5 | Cordon Road Access Configuration | 12-17 |
---|
Figure 13-1 | Strategic Corridors and Peripheral Routes | 13-9 |
---|
Figure E-1 | Power Company Service Areas | Appendix E |
---|
Figure E-2 | Telephone Company Service Areas | Appendix E |
---|
| | |
---|
List of Tables | |
---|
Number |
Table Title |
Page |
---|
Table 2-1 | 20 – Year Financially – Constrained Plan | 2-9 to 12 |
---|
Table 5-1 | Rural Road Functional Classification Characteristics | 5-2 |
---|
Table 5-2 | 2005 Revisions to Functional Classification System | 5-3 |
---|
Table 5-3 | Rural Miles of Roads by Functional Class | 5-4 |
---|
Table 5-4 | Rural Road Surface Types and Conditions | 5-10 |
---|
Table 5-5 | Pavement Condition for Arterials and Collectors | 5-10 |
---|
Table 5-6 | County Bridge Sufficiency Ratings | 5-13 |
---|
Table 5-7 | Restricted County Bridges | 5-14 |
---|
Table 5-8 | Rural Paved Shoulder Mileage | 5-15 |
---|
Table 5-9 | Road Segment Level-of-Service Characteristics | 5-23 |
---|
Table 5-10 | Rural Roadway Segments with LOS C or LOS D | 5-24 |
---|
Table 5-11 | Intersection Level of Service | 5-27 |
---|
Table 5-12 | Intersections Operating at LOS D or worse | 5-28 |
---|
Table 5-13 | Rural County Road High Crash Frequency | 5-31 |
---|
Table 5-14 | Rural State Highway High Crash Frequency | 5-31 |
---|
Table 5-15 | Public Transportation Providers | 5-35 |
---|
Table 5-16 | CARTS Ridership in 2000-1 and 2001-2 | 5-37 |
---|
Table 5-17 | Traffic Control at Rural Railroad Crossings | 5-42 |
---|
Table 5-18 | Airports and Heliports in Marion County | 5-45 |
---|
Table 5-19 | Marion County Ferries | 5-47 |
---|
Table 5-20 | Pipelines in Marion County | 5-49 |
---|
Table 6-1 | Population Projections for Marion County | 6-2 to 3 |
---|
Table 6-2 | Projected Future Traffic Volume Demand | 6-4 to 11 |
---|
Table 7-1 | Evaluation of Strategies | 7-7 to 10 |
---|
Table 8-1 | 2005 Revisions to Functional Classification System | 8-3 |
---|
Table 8-2 | Existing Rural Geometric Design Standards | 8-4 |
---|
Table 8-3 | Road Miles Not Meeting Existing Travel Lane Width Standards | 8-5 |
---|
Table 8-4 | Road Miles Not Meeting Existing Shoulder Width Standards | 8-5 |
---|
Table 8-5 | Safety Projects | 8-7 to 10 |
---|
Table 8-6 | Intersection Traffic Control and Modernization Needs | 8-10 to 11 |
---|
Table 8-7 | Pavement Widening for Modernization Needs | 8-12 |
---|
Table 8-8 | Rural Bridges with Sufficiency Ratings Below 50 | 8-14 |
---|
Table 8-9 | Additional Bridges with Other Needs (Suff Ratings Above 50) | 8-14 |
---|
Table 8-10 | Structures Restricting County Roads | 8-15 |
---|
Table 8-11 | Grade Crossing Projects | 8-15 to 16 |
---|
Table 8-12 | Drainage Deficiencies | 8-17 |
---|
Table 8-13 | Bicycle and Pedestrian Improvement Needs | 8-19 |
---|
Table 8-14 | Special Studies and Localized Plans | 8-20 |
---|
Table 8-15 | Recommended Corridor Studies | 8-21 |
---|
Table 8-16 | Future Widening for Capacity Needs | 8-22 to 23 |
---|
Table 8-17 | Future Intersection Traffic Control and Modernization Needs | 8-23 |
---|
Table 8-18 | Connectivity and Modernization Needs Proposed by Cities | 8-24 |
---|
Table 8-19 | State Highway Safety Needs | 8-25 to 26 |
---|
Table 8-20 | State Highway Modernization Needs | 8-27 to 28 |
---|
Table 8-21 | Connectivity to Interstate or Statewide Highway Guidelines | 8-28 |
---|
Table 8-22 | State and Interstate Highway Widening Needs for Capacity | 8-29 to 30 |
---|
Table 8-23 | Corridor Studies on State Highways | 8-30 to 31 |
---|
Table 8-24 | Regional Planning Efforts and Studies | 8-32 to 33 |
---|
Table 8-25 | State Highway Bridge and Other Restrictions | 8-34 |
---|
Table 8-26 | County Roads Restricted by State Highway Structures | 8-35 |
---|
Table 10-1 | Spacing Requirements for Accesses | 10-3 |
---|
Table 10-2 | Spacing Requirements for New Accesses in Unincorporated Communities and County Roads in Cities with no Access Spacing Standards | 10-4 |
---|
Table 10-3 | Maximum Trip Generation of Developments by Functional Classification of Roadway | 10-22 |
---|
Table 11-1 | 20-Year Financially Constrained Plan | 11-5 to 8 |
---|
Table 11-2 | Unfunded 20-Year Recommended Improvements | 11-14 to 16 |
---|
Table 14-1 | Findings of Transportation Planning Rule Compliance | 14-1 |
---|