Construction-Installation Permit Information and Forms
Septic Construction-Installation Permit Instructions - how to apply for permits, items needed to submit with the application, and the process
Application for Onsite Wastewater Treatment System New Fees 8/1/2024 - the application form for a Septic Construction-Installation permits; includes fee information
Authorization to Apply
Site Plan Requirements- required as part of the Septic Construction-Installation application.
Site Plan Example - Example of a Completed Site Plan
Land Use Compatibility Statement (LUCS) - required for properties in urban growth boundaries, the UT (Urban Transition) Zone, and inside city limit
Onsite Materials List - must list all proposed construction material
Stakeout Procedure - instructions and diagram (if required) by the Site Evaluation Report
Setback Table - shows required distances from septic systems and replacement areas